MINIMATA HASDEO BANGO PROJECT

Started in 1967.

 

It's objectives are

1. To provide water for irrigation.

2. Generation of hydroelectric power.

3. To provide water for cooling purpose
    to the various industrial units.

4. To provide domestic water supply.

 
Units

1. Dam

2. Canal

3. Power Plant

The construction work of all the three units was completed in four stages. In the first stage the Hasdeo Bango barrage near Korba city and the 4 km long left Bank main canal

were constructed. In the second stage, the right bank main canal system was constructed. The main Dam, construction of water treatment plant and extension of right and left bank main canal system were completed. In the third stage, the remaining work of completion of left bank main canal system and Canal distributaries net work was done in the forth stage. The complete project cost was around Rs.693 crores.

Bango Dam

 

Location

North Latitude : 220 36'

East Longitude : 820 36'

The main dam, which is situated 42 kms away from the district headquarter. The Dam has 11 gates, out of which 10 are operational. The dimension of Each gates are 15 x 14.2 meters.  The length of the main Dam is 554.5 meter which constitutes

 

Spill way

:

203.5 Mtr.

Hydro-Electric Dam

:

055.5 Mtr.

Non-over flow Dam

:

295.5 Mtr.

Total

:

554.5 Mtr.

The total length of the dam is 2509.05 Mtrs. The left side of the Main Dam there is one rock filled dam, which has 177 Mtrs long and the right side have an earthen dam of 27 Mtrs height and 1778 Mtrs long

 

 

 

Other Details

Catchment Area

6730 Sq.Km.

 

 

Maximum height of Dam

366.00 Mtr.

Maximum water level

363.08 Mtr.

Minimum water level

329.79 Mtr.

Full Reservoir level

359.66 Mtr.

Spill water level

345.66 Mtr.

Area's average rainfall

1500mm (Max.1920mm.,Min.940mm)

Minimum River level

292.60 Mtr. (River Bed)

Water storage capacity

0.3416 Million hectare or 34160 Lakhs M3

Useful water storage capacity

0.3046 Million hectare or 30460 Lakhs M3

Unuseful water storage capacity

0.0370 Million hectare or 03700 Lakhs M3

HASDEO BARRAGE

Hasdeo Barrage is situated 12 kms away from the District Head Quarter. It was constructed in 1967. Total cost was Rs.10.14 crores.

 

POWER PLANT

A Hydel Power Plant of capacity 120 MW has been commissioned on the Bango Dam at a cost of Rs.77 crore

CANALS

 

 

 

The main part of this project is the canals, which can irrigate about 2 lakhs and 55 thousand hectare of land. For this two canal systems are being constructed, which branch out from the Hasdeo Barrage at Darri.

 

 

Left Bank Canal

Right Bank Canal

Max. Flow

138 M3/Sec.

117 M3/sec.

Length

50 KM.

48 KM.

Branch canals

Champa Branch - 51 KM.

Sakti Branch      - 32 KM.

Kharsia               - 42 KM.

Janjgir Branch  - 22 KM.

Akaltra Branch - 42 KM.

Irrigated Area

1,38,000 Hectare

1,17,000 Hectare

 

In this way an area of 2 lakhs, 55 thousand hectare of land can be irrigated and excess about 17.70 lakhs MT. food grains can be produced from these 287 KM. long canals. If the maximum capacity of these canals is utilized, an area of 4,33,500 hectare of land can be irrigated.

 

 

ESTIMATED BENEFITS FROM THIS PROJECT

1.      Generation of 120 MW Electricity.

2.      Irrigation of 2,55,000 Hectare of land of production of 17.7 Lakh MT. food grains per year.

3.      Supply of water for cooling requirements of 4,000 MW capacity Power Station(530 Million M3) other uses and water for domestic purpose (10 Million M3).

4.      118 MT. Production of fish.

 

 