MINIMATA HASDEO BANGO PROJECT
|
||||||||||||||||||||||
|
Started
in 1967. It's objectives are1.
To provide water for irrigation. 2.
Generation of hydroelectric power. 3.
To provide water for cooling purpose 4. To provide domestic water supply. Units1.
Dam 2.
Canal 3. Power Plant |
|
|||||||||||||||||||||
|
The construction work of all the three units was completed in four stages. In the first stage the Hasdeo Bango barrage near Korba city and the 4 km long left Bank main canal |
||||||||||||||||||||||
|
were
constructed. In the second stage, the right bank main canal system was
constructed. The main Dam, construction of water treatment plant and
extension of right and left bank main canal system were completed. In the
third stage, the remaining work of completion of left bank main canal system
and Canal distributaries net work was done in the forth stage. The complete
project cost was around Rs.693 crores. |
||||||||||||||||||||||
Bango Dam |
|
|||||||||||||||||||||
|
|
Location North
Latitude : 220 36' East
Longitude : 820 36' The
main dam, which is situated 42 kms away from the district headquarter.
The Dam has 11 gates, out of which 10 are operational. The dimension of Each gates are 15
x 14.2 meters. The length of the main
Dam is 554.5 meter which constitutes
|
|||||||||||||||||||||
|
The total length of the dam is 2509.05 Mtrs. The left side of the Main Dam there is one rock filled dam, which has 177 Mtrs long and the right side have an earthen dam of 27 Mtrs height and 1778 Mtrs long |
||||||||||||||||||||||
|
|
|
|||||||||||||||||||||
|
|
|
|||||||||||||||||||||
|
||||||||||||||||||||||
HASDEO BARRAGE
|
||||||||||||||||||||||
|
|
Hasdeo Barrage is situated 12 kms away
from the District Head Quarter. It was constructed in 1967. Total
cost was Rs.10.14 crores. |
|||||||||||||||||||||
POWER PLANT |
||||||||||||||||||||||
|
A Hydel
Power Plant of capacity 120 MW has been commissioned on the Bango Dam at a
cost of Rs.77 crore |
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
CANALS |
|
|||||||||||||||||||||
|
|
The
main part of this project is the canals, which can irrigate about 2 lakhs and
55 thousand hectare of land. For this two canal systems are being
constructed, which branch out from the Hasdeo Barrage at Darri.
In
this way an area of 2 lakhs, 55 thousand hectare of land can be irrigated and
excess about 17.70 lakhs MT. food grains can be produced from these 287 KM.
long canals. If the maximum capacity of these canals is utilized, an area of
4,33,500 hectare of land can be irrigated. |
|||||||||||||||||||||
|
|
||||||||||||||||||||||
|
ESTIMATED BENEFITS FROM
THIS PROJECT 1.
Generation of 120 MW
Electricity. 2.
Irrigation of 2,55,000
Hectare of land of production of 17.7 Lakh MT. food grains per year. 3.
Supply of water for cooling
requirements of 4,000 MW capacity Power Station(530 Million M3) other uses
and water for domestic purpose (10 Million M3). 4.
118 MT. Production of
fish. |
||||||||||||||||||||||